Photo of Steep embankments in Corner Canyon Creek

Corner Canyon Creek Streambank Stabilization

Corner Canyon Creek Streambank Stabilization
Salt Lake County, Utah

As the surrounding area has grown, increasing foot traffic near Corner Canyon Creek highlighted the need for improved streambank safety. Years of natural downcutting had created steep, eroded banks along the corridor. HCF designed a grading solution to reduce bank height and improve safety while staying outside the ordinary high water mark, floodway, and vegetation line to protect native species.

The design included a 3:1 graded slope, two pedestrian bridge crossings, and a full restoration plan with native plantings and slope stabilization. Floodway stage, OHWM, and wetland boundaries were carefully considered to protect the creek’s natural hydraulic function throughout.

Architectural Rendering of a Sustainable House

Living Building Challenge Custom Home — Nevada

Living Building Challenge Custom Home
Blue Diamond, Nevada

HCF provided civil site engineering for a custom home in Blue Diamond, Nevada, pursuing Living Building Challenge (LBC) Petal Certification,  a sustainability standard that exceeds LEED and traditional green building requirements. The desert climate called for a design built around water conservation and self-sufficiency.

HCF designed the site grading and drainage systems to support low-flow fixtures, native landscaping, and rainwater harvesting to an underground cistern that minimizes evaporation and maximizes retention. The stormwater design incorporated bioswales and dry retention ponds, helping the home achieve LBC Petal Certification.

Site photo of the Hull Valley Campground located in Preston Idaho

Hull Valley Canyon Campground

Hull Canyon Campground
Preston, Idaho

The Church of Jesus Christ of Latter-day Saints planned a new 355-acre campground in the mountainous terrain of Hull Canyon, designed to support large youth and group activities. The remote, steep site required a reliable wastewater system for hundreds of users while meeting Idaho Department of Environmental Quality requirements and protecting groundwater.

HCF provided civil and environmental engineering for the campground, including site planning, utility design, and roadway coordination. HCF designed a septic system serving approximately 300 visitors, with multiple lift stations and a distributed drainfield exceeding 40,000 square feet — incorporating water conservation measures for long-term, low-impact operation.

Pre-construction site conditions at Desert National Wildlife Refuge Fire Cache Station, Corn Creek Station, Nevada

Desert National Wildlife Refuge – Fire Cache & Bunkhouse

Desert National Wildlife Refuge – Fire Cache & Bunkhouse

Corn Creek Station, Lincoln County, Nevada

HCF served as the civil engineering design lead for the U.S. Fish and Wildlife Service (USFWS) Nevada Fire Zone Fire Complex, a federal design-build project located within the Desert National Wildlife Refuge at Corn Creek Field Station in Nevada. The project supports wildfire operations serving approximately 1.7 million acres of federally managed refuge lands and includes a new fire cache station and associated bunkhouse facilities.

HCF’s civil engineering scope included site grading, drainage analysis, utility infrastructure design, access roads, parking areas, concrete sidewalks, erosion control measures, and preparation of civil site development plans. HCF coordinated closely with the design-build contractor and a multi-disciplinary team (architect, MEP, structural, and archeology) through phased federal submittals at the 50%, 90%, and 100% design milestones. Additional services included design and permitting of the onsite septic system through the Southern Nevada Health District, wastewater demand calculations, and domestic water distribution system design using EPANet 2.2 hydraulic modeling to support reliable service in a remote refuge environment.

Cercla Project photo taken in the fall in Utah

Salt Lake City VAMC -CERCLA

SLC CERCLA Storage – VA Medical Center Site Design

Salt Lake City, Utah

HCF provided civil site design services for a CERCLA storage facility at the George E. Wahlen Department of Veterans Affairs Medical Center in Salt Lake City, Utah. The project required a detailed layout design to maximize the available area allotted by the VA, incorporating a 50-foot turning radius to accommodate large vehicles loading and unloading soil samples. An alternative drive-through configuration was also designed to provide additional operational flexibility.

HCF’s scope included surveying all existing site features, designing a concrete pad at appropriate grading and slope to conform with existing conditions, and coordinating around significant utility conflicts including 30-inch and 36-inch storm drains owned by Salt Lake City Public Utilities and a 6-inch gas line requiring 36 inches of vertical separation. The final design fit three connex box containers between an existing light pole and storm drain manhole while maintaining required clearances. HCF also managed the acquisition of all applicable environmental permits throughout the project.

Site Photo with cliff and rocks with a steep embankment

Little Cottonwood Creek Tributary

Little Cottonwood Creek Tributary – Slope Mitigation

Cottonwood Heights, Utah

HCF provided an engineering evaluation of slope stability and structural support for an existing residence in Cottonwood Heights, Utah, in response to City review under the Sensitive Lands ordinance. Field observations and survey data were used to assess the relationship between the hillside, existing improvements, and the home’s structural zone of influence, confirming that slope conditions do not adversely affect the support of the residence. Based on conservative geometric assumptions and stability criteria, the home was determined to meet accepted static and seismic safety factors.

HCF’s scope also included preparation of grading and erosion control plans, development of rockery stability calculations, and coordination with project stakeholders to support City review and approval. The project emphasized restoring long-term slope stability through appropriate erosion control measures and revegetation of the disturbed hillside adjacent to the Little Cottonwood Creek tributary.