Sandlin

Project Info

  • Construction Date

    2017

  • Category

    All, Critical Infrastructure, Water Resources

  • Services Provided

    HEC-RAS Modeling, Hydraulic Analysis, Shoreline Stabilization, Permitting

Sandlin – Upper Provo River Hydraulic Analysis

Summit County, Utah

HCF performed a hydraulic analysis of proposed channel and shoreline stabilization measures along the Upper Provo River in Summit County, Utah, evaluating potential impacts on the 100-year flood elevation. A HEC-RAS hydraulic model was developed to assess the effect of proposed rock armoring on river hydraulics, with a secondary steady-state analysis performed using FHWA Hydraulic Analysis Toolbox methods to provide a conservative comparison.

Publicly available DEM data and proposed design geometry were incorporated to simulate existing and post-construction conditions. Modeling results documented that the proposed stabilization improvements would not result in a meaningful increase in flood levels, supporting regulatory permitting and coordination with the Wasatch County Planning Department and other state agencies.